Nanjing K.K. Chemical provides professional water treatment solutions!
Nanjing Kaiguang Chemical provides professional water treatment solutions!

Preparations before construction:


1. To achieve good working conditions, place the materials in an environment of 18 - 25°C for 24 hours before grouting. Control the ambient temperature at 5 - 30°C during grouting and within 24 hours after grouting. A temperature above 20°C is most suitable. Avoid direct sunlight during summer construction. When the temperature is low in winter, build a shed to increase the temperature.
2. The concrete in the grouting area needs to be roughened, free of water, dust, oil stains, etc. A 25mm chamfer should be ground on the outer edge.
3. The formwork should be firmly overlapped and smooth. Seal the gaps between the formwork joints and the foundation with cement or silicone (do not touch the grouting area). Apply grease, wax, or PVC adhesive tape on the inner side to facilitate demolding. Leave a distance of more than 100mm between the formwork and the equipment base, and the formwork should be more than 100mm higher than the equipment bottom plate. Nail a 25mm thick 45° beveled wooden strip at the grouting level on the inner side of the formwork to avoid stress concentration.
4. If the grouting area is larger than 2m × 2m × 150mm, leave an expansion joint 20mm wide. Wood boards or foam can be used.
5. Construction workers need to wear safety helmets, goggles, gloves, work shoes, etc.

Mixing
1. Pour Component B (curing agent) into Component A (resin) and mix thoroughly for 2 - 4 minutes with a hand-held mixer at about 250 revolutions per minute (mix with Component C as soon as possible).
2. For a vertical mixer at about 20 revolutions per minute, first add Component C (aggregate), then add the pre-mixed Components A and B, and then stir thoroughly until all the aggregate is wetted, which takes about 1 minute.
3. When the temperature is low or the grouting area is large, the amount of Component C (aggregate) can be appropriately reduced.

Grouting
1. Grouting should be carried out from one side to the other. Avoid vibration during the grouting process. The extrusion method or the high-position funnel method can be used for grouting. Grouting must be continuous and completed as soon as possible.

After the construction is completed:
1. Inspection: You can use a hammer to tap the base plate.
2. Cleaning: Clean the machinery with a wet cloth within one hour.
3. Finishing: You can use a trowel to pick up a small amount of solvent to smooth the surface two hours after grouting.
4. Demolding: After the construction is completed, demolding can be carried out when the initial setting is reached depending on the ambient temperature.
Curing time (final setting): 72 hours @ 15°C, 48 hours @ 20°C, 36 hours @ 27°C, 24 hours @ 35°C

Engineering achievements


Natural gas, coalbed methane, cement in chemical plants and power plants

  • Shanghai Jinshan Petrochemical Plastics Factory
  • Jinling Petrochemical Power Plant
  • Beijing sinoal Company
  • Mudanjiang Cement Factory
  • Yangzi Petrochemical Factory
  • Nanjing Thermal Power Plant
  • Sichuan Lutianhua Natural Gas
  • Sinoma Construction
  • Jiangxi Jiujiang Petrochemical General Factory
  • Changshu Power Plant
  • Yingmaili Treatment Plant of West-East Gas Pipeline
  • Jingyang Cement
  • Qilu Petrochemical Plastics Factory
  • Jiangsu Ligang Power Plant
  • Changqing Oil and Gas Production Plant No.1
  • Yadong Cement
  • Nanhua Nitrogen Fertilizer Factory
  • Jiangsu Xuzhou Power Plant
  • Changqing Oil Sulige Gas Field
  • Dalian Cement
  • Zhenhai Refining and Chemical Plant
  • Guangdong Shajiao Power Plant
  • Shanxi Ganghua Coalbed Methane
  • Sichuan Guang'an Cement
  • Dow (Zhangjiagang)
  • Shenzhen Mawan Power Plant
  • Inner Mongolia Natural Gas and Paper Industry
  • Zhuhai BP Factory
  • Dongguan Shajiao Power Plant
  • CNPC Chongqing Gas Mine
  • Jindong Paper
  • Shanghai Petrochemical Factory
  • Nanjing Thermal Power Plant
  • Tazhong Treatment Plant of West-East Gas Pipeline
  • Chenming Paper
  • Huizhou Shell 1 million tons of ethylene
  • Zhangzhou Houshi Power Plant
  • Yigao Coalbed Methane
  • Asia Pulp & Paper
  • Shanghai Secco 1 million tons of ethylene
  • Formosa Plastics Thermal Power Plant
  • Changchun Gas
  • Shandong Bohui Paper
  • Yangzi BASF Factory
  • Zhuhai Power Plant
  • Datong Gas
  • Chenming Paper
  • Formosa Plastics PVC, ABS Factory
  • Zhuankou Power Plant
  • TaZhi Tazhong Treatment Plant
  • Zhejiang Yisheng Petrochemical
  • Guodian Jianbi Power Plant
  • CNPC Shanxi Coalbed Methane
  • Shanghai Refinery
  • Lanzhou Petrochemical 600,000 tons of ethylene Port, ship, bridge
  • Qingdao Port Authority
  • Qinshui Booster Station of West-East Gas Pipeline Steel plant
  • Celanese 600,000 tons of acetic acid
  • Ningbo Port Authority
  • Huaiyin Iron and Steel Plant Air separation plant
  • Dushanzi 1.2 million tons of ethylene
  • Shenzhen Haixing Port
  • Handan Iron and Steel Air separation plant
  • Jiaxing Teijin Daily Chemical Factory
  • Qinhuangdao Port Authority
  • Pangang Metallurgical Construction
  • Nanjing American Air separation plant
  • Tianjin Ship Repair Factory
  • Benxi Air separation plant
  • Changshu American DuPont Factory
  • Nanjing Yangtze River Bridge
  • Shenda Metal Factory
  • Urumqi Petrochemical Factory
  • Zhangzhou Huisman Steel
  • Sinopec Fujian Large Ethylene
  • Sichuan Chuanwei Group Ironmaking Plant
  • Sinopec Zhongyuan Ethylene
  • Nanjing Meishan Air separation plant
  • Sinopec Zhenhai Large Ethylene Project

  

Pre:Chockfast Oranger Next:None

We have many years of experience and provide complete water treatment solutions!